Transferring Pedestrians and Utilities During Demolition and Build of a 75-Year-Old-Bridge
Using a combination of 24m and 18m box girder deck unit to transfer pedestrians and utilities to the other side.
Read more
Using a combination of 24m and 18m box girder deck unit to transfer pedestrians and utilities to the other side.
Selby Station needed a temporary footbridge. Our Lightweight 18-metre-long U-Frame bridge was perfect for the job.
The £1.3 billion project requires uninterrupted access routes are required during the extensive construction activities.
Limited space on this exclusive regeneration project in West London required a unique solution.
Mitchell Bridges celebrates a fourteen year long collaboration with Ascot Racecourse, the jewel of the UK's horse racing calendar.