Transferring Pedestrians and Utilities During Demolition and Build of a 75-Year-Old-Bridge
Using a combination of 24m and 18m box girder deck unit to transfer pedestrians and utilities to the other side.
Each project is unique but we've solved lots of problems for lots of clients, have a look below to see if there is one like yours.
Using a combination of 24m and 18m box girder deck unit to transfer pedestrians and utilities to the other side.
Selby Station needed a temporary footbridge. Our Lightweight 18-metre-long U-Frame bridge was perfect for the job.
Ageing road networks cause highways to fail, solutions that can be delivered quickly are vital to ensure minimum disruption.
The £1.3 billion project requires uninterrupted access routes are required during the extensive construction activities.
Limited space on this exclusive regeneration project in West London required a unique solution.
Mitchell Bridges celebrates a fourteen year long collaboration with Ascot Racecourse, the jewel of the UK's horse racing calendar.